As with all excavation works there will be some dust created, however the majority of the ground
works will take place through the autumn and winter months, this should reduce the amount of
dust because of the rain expected. Dust will be reduced further if required, by spraying additional
water in areas where dust is generated. All skips on site and lorries entering and leaving the site
will be covered. We will look to use the newly installed road network as the main traffic routes
and plan our works to keep vehicle movements to a minimum. To manage mud being spread
beyond the site, vehicles will be washed down including the wheels. There will also be regular
use of a road sweeper throughout the construction period.